1.
The Analysis Of Overall Equipment Effectiveness On The Heading Machine To Minimize Six Big Losses Using The Total Productive Maintenance Method: A Case Study Of PT XYZ. JIEHIS. 2026;7(1):11-16. doi:10.14421/jiehis.5991