The Analysis Of Overall Equipment Effectiveness On The Heading Machine To Minimize Six Big Losses Using The Total Productive Maintenance Method: A Case Study Of PT XYZ. (2026). Journal of Industrial Engineering and Halal Industries, 7(1), 11-16. https://doi.org/10.14421/jiehis.5991