[1]
“The Analysis Of Overall Equipment Effectiveness On The Heading Machine To Minimize Six Big Losses Using The Total Productive Maintenance Method: A Case Study Of PT XYZ”, JIEHIS, vol. 7, no. 1, pp. 11–16, Jun. 2026, doi: 10.14421/jiehis.5991.