BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY

Authors

  • ari andriyas puji universitas muhammadiyah riau

DOI:

https://doi.org/10.14421/jiehis.3501

Keywords:

TPM, OEE, Six Big Losses, Fishbone Diagram

Abstract

Productivity is an activity in producing an item or product using the most effective and efficient way possible. To increase the productivity of machines/equipment, it is necessary to apply TPM. Section CV 6 has applied the TPM method, but it doesn't work consistently so there are still a lot of loss time. As a result of the loss time, the resulting production is not in accordance with the company's target. So the purpose of this research is to measure the productivity level of a bielomatic machine by using the Overall Equipment Effectiveness (OEE) method and to minimize the Six Big Losses which are the cause of the decline in engine performance. Based on the results of the implementation of the method and discussion, the results of the calculation of the OEE value from 62.76% - 80.03%, it can be concluded that the bielomatic machine still has an OEE value below the standard 85%. From the calculation of the six big losses, several factors were found that caused the low productivity of bielomatic machines, namely the setup and adjustment, Equipment Failure, and Reduced Speed ​​sections. This study also provides input for improvements in the setup and adjustment, Equipment Failure, and Reduced Speed ​​sections after parsing existing problems using Fishbone diagrams.

References

Alvira, D., Helianty, Y., & Prassetiyo, H. (2015). Usulan Peningkatan Overall Equipment Effectiveness ( Oee ) Pada Mesin Tapping Manual Dengan Meminimumkan Six Big Losses. Jurnal Itenas Bandung, 03(03), 240–251.

Ardian, A. (2010). Perawatan dan Perbaikan Mesin. Kementrian Pendidikan Nasional Universitas Yogyakarta Teknik Mesin, December, 1–77.

Gelisman, J., & Ginting, E. (2016). Implementasi Total Produktive Maintenance Dengan Metode Overall Equipment Effectiveneess (OEE) Untuk Menentukan Maintenance Strategi Pada Mesin Digester Plant (Studi Kasus PT. Toba Pulp Lestari, Tbk).

Hamid, A., & Purnomo, S. A. (2018). Analisa Efektivitas Kinerja Mesin Turning Star SB-16 Dengan Metode Total Productive Maintenance ( TPM ) di PT Mitsuba Indonesia Dosen Teknik Industri Universitas Pamulang. Jitmi, 1(1), 50–63.

Poniman, P., Cundara, N., & Afma, V. M. (2015). Menurunkan Cost of Quality Pada Proses Cutting and Crimping Di Mesin Opr-rs 6w Pada PT. Sumitomo Wiring System Batam Indonesia. PROFICIENSI: The Journal of the Industrial Engineering Study Program, 3(2).

Rifaldi, M. R. (2020). Overall Equipment Effectiveness (OEE) Pada Mesin Tandem 03 Di PT. Supernova Flexible Packaging. Jurnal Rekayasa Industri (Jri), 2(2), 67–77. https://doi.org/10.37631/jri.v2i2.180

Syahruddin. (2012). Analisis Sistem Perawatan Mesin Menggunakan Metode Reliability Centered Maintenance (RCM)Sebagai Dasar Kebijakan Perawatan yang Optimal di PLTD “X.” Jurnal Tekhologi Terpadu, 1(7), 42–49.

Wahono, S., & Sukmono, T. (2012). PENGUKURAN KINERJA MESIN PRODUKSI MENGGUNAKAN METODE OVERALL THROUGHPUT EFFECTIVENESS GUNA MENINGKATKAN HASIL PRODUKSI. 199–210.

Wibisono, D. (2021). Analisis Overall Equipment Effectiveness (OEE) Dalam Meminimalisasi Six Big Losses Pada Mesin Bubut (Studi Kasus di Pabrik Parts PT XYZ). Jurnal Optimasi Teknik Industri (JOTI), 3(1), 7–13. https://doi.org/10.30998/joti.v3i1.6130

Downloads

Published

2022-07-31

How to Cite

puji, ari andriyas. (2022). BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY. Journal of Industrial Engineering and Halal Industries, 3(1), 26–34. https://doi.org/10.14421/jiehis.3501